Performance / Metrics linked to F2
Metrics (22)
AG.2.4 — Fulfill Agility METRIC
The organization’s ability to quickly adapt its strategic and operational fulfill response to demand and/or supply shocks. Strategic Fulfill Agility is the number of days needed to meet a 25% unplanned change in demand. Operational Fulfill Agility is the sustained percentage increase or decrease in shipment quantities that can be achieved in operational planning horizon (commonly 30 to 60 days).
Strategic agility …
Strategic agility …
Formula / Calculation
Strategic Fulfill Agility is calculated by identifying the master data setting for the longest shipment lead times as noted in the system of record. Operational Fulfill Agility is calculated by dividing the new shipment volume by the original planned shipment volume. Both measures assume no expedite costs.
Percentage of labor used in logistics but not used in direct activity.
Additional delivery volume.
Number of orders shipped.
Gross finished goods inventory / (Value of transfers / 365 days).
Note: Value of transfers is the amount transferred, in a fiscal year, from one stage of the manufacturing process to another, such as the amount of raw materials that are transformed into work in process.
Note: Value of transfers is the amount transferred, in a fiscal year, from one stage of the manufacturing process to another, such as the amount of raw materials that are transformed into work in process.
Formula / Calculation
Gross finished goods inventory / (Value of transfers / 365 days)
Total weight or volume of renewable materials.
Total weight or volume of non-renewable materials.
Total renewable energy consumption.
Total nonrenewable energy consumption.
EV.2.5 — Water Withdrawal METRIC
Total water withdrawal in megaliters.
EV.2.6 — Water Discharged METRIC
Total water discharge in megaliters.
Scope 1 emissions from owned or controlled sources.
Scope 2 emissions from generated or purchased electricity, steam, heating, and cooling consumed by the company.
Scope 3 emissions from sources not owned or controlled by the company.
Percentage of waste diverted from disposal relative to total weight of waste generated.
Percentage of waste directed to disposal relative to total weight of waste generated.
The percentage of orders delivered in an undamaged state that meet specification, have the correct configuration, are faultlessly installed (as applicable) and are accepted by the customer.
An order is considered to be delivered in perfect condition if all items:
- are undamaged
- meet specification
- have the correct configuration (as applicable)
- are faultlessly installed (as applicable)
- are accepted by …
An order is considered to be delivered in perfect condition if all items:
- are undamaged
- meet specification
- have the correct configuration (as applicable)
- are faultlessly installed (as applicable)
- are accepted by …
Formula / Calculation
(Number of orders delivered in perfect condition / Number of orders delivered) x 100%
Total number of Returns received in full / total number of returns received
Correct item return = Total number of correct Returned items/Total items returned. Includes correct SN unit when required.
Correct item return = Total number of correct Returned items/Total items returned. Includes correct SN unit when required.
Formula / Calculation
Correct item return = Total number of correct Returned items/Total items returned. Includes correct SN unit when required.
RS.2.4 — Fulfill Cycle Time METRIC
The average time associated with Fulfill processes.
Discussion:
Level-3 metrics that are used to drive the calculation of Fulfill Cycle Time are taken from the applicable Fulfill process elements, depending on the possible strategies deployed by companies to fulfill orders (such as make-to-stock (MTS), make-to-order (MTO) or engineer-to-order (ETO)). When an MTS or MTO strategy is deployed, the optional metric Sc…
Discussion:
Level-3 metrics that are used to drive the calculation of Fulfill Cycle Time are taken from the applicable Fulfill process elements, depending on the possible strategies deployed by companies to fulfill orders (such as make-to-stock (MTS), make-to-order (MTO) or engineer-to-order (ETO)). When an MTS or MTO strategy is deployed, the optional metric Sc…
Formula / Calculation
Fulfill Cycle Time = MAX {[Reserve Resources and Determine Fulfill Date Cycle Time + Build Loads Cycle Time + Route Shipments Cycle Time + Select Carriers and Rate Shipments Cycle Time] + Receive Product from Source or Transform Cycle Time} + Pick Product Cycle Time + Pack Product Cycle Time + Load Vehicle and Generate Shipping Documents Cycle Time + Ship Product Cycle Time + (Receive and Verify Product by Customer C…
The current logistics order cycle time, including customer order processing cycle time, dock-to-stock cycle time, pick-to-ship cycle, transit time, and the time required for other related processes.
Number and rate of work-related injuries per 1.000.000 hours worked
Number and rate of work-related ill health per hours worked