Global Index for F2
All direct incoming and outgoing relationships grouped by node type.
METRIC 22
- AG.2.4 — Fulfill Agility METRIC
- AG.3.2 — Percentage of Labor Used in Logistics but Not Used in Direct Activity METRIC
- AG.3.5 — Additional Delivery Volume METRIC
- AG.3.8 — Current Delivery Volume METRIC
- AM.3.5 — Inventory Days of Supply — Finished Goods METRIC
- EV.2.1 — Renewable Materials Used METRIC
- EV.2.2 — Nonrenewable Materials Used METRIC
- EV.2.3 — Renewable Energy Consumed METRIC
- EV.2.4 — Nonrenewable Energy Consumed METRIC
- EV.2.5 — Water Withdrawal METRIC
- EV.2.6 — Water Discharged METRIC
- EV.2.7 — Direct (Scope 1) GHG Emissions METRIC
- EV.2.8 — Energy Indirect (Scope 2) GHG Emissions METRIC
- EV.2.9 — Other Indirect (Scope 3) GHG Emissions METRIC
- EV.2.10 — Generated Waste Diverted from Disposal METRIC
- EV.2.11 — Generated Waste Directed to Disposal METRIC
- RL.2.4 — Customer Order Perfect Condition METRIC
- RL.3.56 — Delivery Item Return Accuracy from the Customer METRIC
- RS.2.4 — Fulfill Cycle Time METRIC
- RS.3.44 — Current Logistics Order Cycle Time METRIC
- SC.3.6 — Work-related injuries METRIC
- SC.3.7 — Work-related ill health METRIC
PROCESS 13
- F — Fulfill PROCESS
- F2.1 — Receive B2B Product from Source or Transform PROCESS
- F2.2 — Receive order signal PROCESS
- F2.3 — Pick product PROCESS
- F2.4 — Pack and/or kit product PROCESS
- F2.5 — Stage product PROCESS
- F2.6 — Schedule transportation PROCESS
- F2.7 — Notify and confirm dock appointment PROCESS
- F2.8 — Load vehicle and generate shipping document PROCESS
- F2.9 — Invoice PROCESS
- F2.10 — Ship product PROCESS
- F2.11 — Assemble or install product PROCESS
- F2.12 — Obtain proof of delivery or customer acceptance PROCESS